Firstly the floor served by the stub stack should be no more than 1 3m high from the invert of the drain that it connects to.
Ground floor bathroom drainage.
If the invert of the drain sewer is already over 1m deep this will mean it is unlikely that it can be used in conjunction with a stub.
This is known as the slope or fall of your drainage system.
If the new bathroom is on the second floor the bathroom s main drain will have to travel through the wall on the first floor and down to the basement or crawlspace.
An up flush drainage system features a pump that removes sewage from a holding tank located behind a toilet tub or shower and pumps it into the home s main drain which ties into the line leading to the city sewer main located at a higher elevation.
Consider it all a preplan at this point.
Close the bathroom door and allow the mixture to sit for two hours.
Walls toilet sink shower and finally the drain lines.
Chances are you ll have to make some changes as the plan develops.
If a drain line is nearby you may choose to run a pipe to it rather than running a new line.
This powered drain snake has a long length of flexible metal with teeth on the tip that can help cut through roots clogging drains.
Secondly the stub stack should be no more than 2m high to its highest connection.
But many basement drains don t provide adequate fall making natural drainage a problem.
This is a great way to try different layouts ideas for your bathroom.
Then grab a pencil and mark out the whole bathroom on the basement floor.
Above ground plumbing relies on gravity to drain sewage and wastewater.
Traditional bathroom setups are designed with a single fixed positioned primary drainage trap which typically houses the central floor waste outlet or overflow gully for the entire bathroom.
Drainage is an important consideration when planning your basement bathroom.
The drain inlet at the top photos 5 and 8 is optional.
However it may be difficult to run a toilet s 3 inch or 4 inch drain to an.
It is from this centralised drainage point that all other waste outlets from the bathroom s fixtures showers basins bathtubs etc are connected.
There must also be 24 inches of clearance in front of the shower entry and the shower floor must occupy a minimum area of 30 by 30 inches.
Rinse the drain with a gallon of hot water wait 15 minutes then rinse with cold water for ten minutes.
Installing drainage pipes sewer pipe sticking out of ground.
For an all purpose bathroom cleaner that works in your drain too pour baking soda into the drain followed by the vinegar.